YOUR RECURRING CHALLENGES

UNSTABLE SENSOR OR INSTRUMENT

Possible causes: the technical requirements of the manufacturer are not met, the operating conditions are outside the ranges tested during development, algorithms requiring adjustments, the installation requires modifications, defective parts.

LACK OF TESTING AREA

Possible causes: continuous improvement is not applied periodically, your growth is suddenly accelerated, you have a temporary specific project, you need to temporarily increase your inventory.

INSUFFICIENT PRODUCTION YIELD

Possible causes: the 6 sigma approach is not applied periodically, the quality control needs adjustment, the tests on the prototypes were insufficient, your supplier's quality control system has changed, the pass/fail criteria for product passage were ill-defined.

LACK OF TECHNICAL CAPACITY

Possible causes: you have a hiring freeze, continuous improvement has not been sustained, you have many obsolescence issues, one of your key resources has just left, a new project has just started, your growth is accelerating.

MAJOR BLOCKING IN YOUR DESIGN

Possible causes: your initial assumptions are invalid, the risk analysis is incomplete, you have a lack of key technical personnel, the team is working without controlling customer needs, you have few or no prototypes.

SLOW PRODUCT DEVELOPMENT

Possible causes: you are missing some key technical resources, your metrics in place do not allow project tracking (KPI) to reduce development time, the technical critical path is missing some key aspects, simultaneous engineering needs to be strengthened, poorly defined technical requirements, project management must be improved, the market strategy may need to be reviewed

OTHER CHALLENGES OR IMPROVEMENTS? CONTACT US!

Our expertise is multiple and our network of contacts is very specialized. Do not hesitate to contact us in order to serve you better.